6. Hold the module firmly in both hands and pull it all the way out.
CAUTION: The module might be hot.
Installing a RAID controller or expansion adapter
To install a RAID controller or expansion adapter:
1. Install the module part way into the chassis, far enough in so that it is supported
physically by the housing.
2. Connect the cables.
3. Continuing installing the module in the chassis, as shown in the following diagram.
4. If inserting an expansion adapter on a system that has a redundant controller,
remove and reinsert the controller to start initialization. If inserting a controller or
expansion adapter on a system that does not have a redundant controller, power up
the system.
5. Verify RAID controller initialization as displayed by the module’s Ready LED.
This process takes approximately three to eight minutes. Refer to
controller status LEDs” on page 56
.
6. Check RAID controller status using NetCentral or the Grass Valley Storage Utility.
Replacing a power supply
• Use power cables that are shipped with the RAID unit.
• The K2 10G RAID and K2 10G Expansion Chassis have dual power supply
configurations so that they do not halt if one power supply breaks down. Even if a
!
NF
COD
E LAB
EL
OPT
ION LA
BEL
Power supply
Controller
or expansion
adapter
HO
T
UN
IT LA
BEL
Ejectors
1
Finish inserting
2
the module in the chassis.
Close the ejectors, firmly pressing
the protruding portions of the ejectors.
Confirm that both ejectors are locked.