beautypg.com

Powering on the router, Checking before powering on the router, Checking/operating after power-on – H3C Technologies H3C MSR 20-1X User Manual

Page 38

background image

31

Figure 31 Set the terminal type

Powering on the Router

Checking before powering on the router

Before power-on, check that:

The power cord and PGND cable are correctly connected.

The voltage of the power supply is the one indicated on the label of the router.

The console cable is properly connected, the console terminal has been started, and the
configuration parameters have been set.

WARNING!

Before power-on, you must be aware of where the power switch is located so that you can disconnect the
power supply in time in case of an accident.

Powering on the router

Step1

Turn on the site power.

Step2

Turn on the power switch on the router.

Checking/operating after power-on

After powering on the router, check that:

1.

The LEDs on the front panel are normal.

2.

The console terminal display is normal.

For the local configuration, after you power on the router, you can see the startup banner (refer to section

Startup Process

on page

32

).

This manual is related to the following products: