beautypg.com

Verifying the installation – H3C Technologies H3C S9800 Series Switches User Manual

Page 39

background image

31

Figure 38 Installing an LPU on the S9804 switch

(1) LPU-pushing direction

(2) Ejector lever-closing direction

(3) Screw-tightening direction

Figure 39 Installing an LPU on the S9810 switch

(1) LPU-pushing direction

(2) Ejector lever-closing direction

(3) Screw-tightening direction

Verifying the installation

After you complete the installation, verify that:

There is enough space for heat dissipation around the switch.

The grounding cable is connected correctly.

The power modules are as required.

The power cords are connected correctly.