System installation check list – ACTi NVR 3 Corporate User Manual
Page 14

NVR 3 Corporate System Administrator
’s Manual
System Installation Check List
Pre-installation
Item
Task
Description
Reference
1
Prepare software
license
NVR 3 comes with
1-channel
free license
for ACTi cameras and non-ACTi cameras
each. For additional channels, please
purchase the license from your system
supplier and get the license information
ready before activation.
License and Activation
on page 26
2
Prepare the server
computer
Make sure the computer
’s hardware spec,
operating system and IE browser version
are compatible with software requirements.
System Requirements
on page 17
3
Assign a fixed IP for
server computer
The server computer should possess a fixed
IP for NVR server.
4
Set up Active Directory
service (Optional)
To add users through the Active Directory
service, please make sure an Active
Directory server is available in your domain.
Installation
Item
Task
Description
Reference
5
Install NVR Server
software
Follow the instructions to install the software
on server computer.
Server Installation on
page 20
6
Check if the installation
is successful
Log in to NVR server to check if you can see
the login page. (On server computer, type
in browser’s URL bar).
Log In to the System on
page 31
7
Activate the license
Activate your license key to get your
required number of channels ready for
adding cameras.
License and Activation
on page 26
Configuring the Cameras
Item
Task
Description
Reference
8
Get the cameras
connected and ready
for use
Finish the installation and basic settings of
all cameras (IP address, usernames,
passwords, ports, internal storage, etc), and
attach all external hardware devices (alarms
or sensors) if necessary.
Camera’s Manual
9
Connect external
devices with the NVR
Client PC
Attach
necessary
external
hardware
peripheral such as a joystick or a
microphone to the client computer.
System Setup
Item
Task
Description
Reference
10
Configure the Storage
Settings
Activate the disks for recording and make
sure the total memory space is sufficient,
Storage Management on
page 105