beautypg.com

Legrand EFB610-CTR User Manual

Page 2

background image

2a. Concrete pour: Screed the concrete flush with the top

of the mudcap.

2b. Mudcap removal: Remove mudcap from box.

2c. Preparation: Before installing cover, remove any

concrete or preset that has made it’s way onto the trim
flange. Test fit cover onto trim flange to ensure that no
debris is keeping it from laying flush with the top edge of
the trim ring.

NOTE: Plastic trim ring stays in concrete.

Do not remove.

This manual is related to the following products: