3safety requirements – K-Patents PR-23-SD Generation 1 User Manual
Page 6

Document/Revision No. BP-EN-SDGEN1 1.0 Effective: April 1, 2013
6
Installation Equipment
Figure 2
Installation equipment
1
Retractor inner casing
Supplied by K-Patents
2
Retractor outer casing
Supplied by K-Patents
3
Adjustable wrench
4
Combination wrench, 19 mm / 3/4 in
5
Flat head screwdriver
6
Allen key 8 mm / 5/16 in
7
Thread seak tape
8
Sensor insertion / removal instruction card
Supplied by K-Patents
9
Product user manual
Supplied by K-Patents
NOTE: The material of the SDI valve body that is welded onto a process pipe is Duplex
steel SAF2205 (EN 1.4462, ASTM S32205/S31803). Choose the welding method and
filler accordingly.
K-Patents recommends complying with the applicable EN / ASTM standards.
3
Safety Requirements
These safety requirements must be followed at all times when installing, operating, or
servicing PR-23-SD sensor. These are the minimum safety requirements – your company
may require additional PPE (personal protective equipment).
For more information on safety issues, please see K-Patents Safety Instructions.
PROCESS
REFRACT
OMETER
PR-23
1
2
3
4
5
6
7
9
8