beautypg.com

2 component checklist – K-Patents PR-23-SD Generation 1 User Manual

Page 4

background image

Document/Revision No. BP-EN-SDGEN1 1.0 Effective: April 1, 2013

4

● Use suitable type of steam for cleaning the prism. Dry saturated steam and 10-12 bar

(150-180 psi) are recommended.

● Access to steam. The distance between the steam supply and the SD sensor system

should be considered for the length of steam piping.

● Access to drain for steam trap condensate outlet.

● Emergency shower and eye wash should be easily accessible. Water can also be used

for cleaning SDI valve lip seals and sensor after sensor removal.

● Shut-off valve needs pressurized instrumentation air (5-10 bars / 70-150 psi).

● Ensure connection to the power supply (110-230V AC).

If these conditions do not apply, please reconsider the intended location for your installation
or contact K-Patents.

2.2 Component Checklist

Before starting installation, make sure you have all the tools and components listed below.

NOTE: Components 4–6 are connected by union nipple or piping not included in
the delivery.

This manual is related to the following products: