Ivoclar Vivadent IPS e.max CAD-on User Manual
Page 37
37
Note:
– Select the firing parameters on the basis of the furnace.
– A maximum of 6 units (e.g. 6 single crowns or two 3-unit bridges) may be fired simultaneously.
Glass-ceramic
Fusion
Pr
ocess
Do not place the restoration at the periphery of the IPS e.max CAD Crystallization Tray.
Place the restoration including the pins into the centre of the IPS e.max CAD Crystallization Tray.
Furnace
P300
Pre-
drying
(software 5.1
or higher)
B
[°C/°F]
403/757
S
[min]
02:00
t
1
[°C/°F/min]
30/54
T
1
[°C/°F]
820/1508
H
1
[min]
02:00
t
2
[°C/°F/min]
30/54
T
2
[°C/°F]
840/1544
H
2
[min]
07:00
V1
1
/
V1
2
[°C/°F]
550/820
1022/1508
V2
1
/
V2
2
[°C/°F]
820/840
1508/1544
L
[°C/°F]
600/1112
t
l
[°C/°F/min]
0
Furnace
P500
P700
EP 5000
[°C/°F]
403/757
[min]
6:00
B
[°C/°F]
403/757
S
[min]
02:00
t
1
[°C/°F/min]
30/54
T
1
[°C/°F]
820/1508
°F
[min]
02:00
t
2
[°C/°F/min]
30/54
T
2
[°C/°F]
840/1544
H
2
[min]
07:00
V1
1
/
V1
2
[°C/°F]
550/820
1022/1508
V2
1
/
V2
2
[°C/°F]
820/840
1508/1544
L
[°C/°F]
600/1112
t
l
[°C/°F/min]
0
Programat P500, P700, EP 5000
Firing parameters: IPS e.max CAD-on technique Fusion/Crystallization firing
Programat P300
Firing parameters: IPS e.max CAD-on technique Fusion/Crystallization firing
Use the pre-drying function for this firing cycle. For pre-drying, set the furnace head position to 100%.
Notes on cooling after completion of the firing program
In order to ensure "smooth" cooling of the restoration after firing, please observe the following notes:
– Wait for the acoustic signal or optical indication of the furnace at the end of the firing cycle before the firing tray with
the fired objects is removed.
– Do not touch the hot objects with metal tongs.
– Allow the objects to cool to room temperature in a place protected from draft.