beautypg.com

Gasboy 9123K Vapor Rcvry Kit User Manual

Page 6

background image

Installation of the Vapor Recovery Kit for Models 9123K and 9823K

Page 6

MDE-4619 Vapor Recovery Kit Installation Instructions for Models 9123K and 9823K • December 2006

Figure 1:

Assembled View

Grommet, 1.5" OD x
7/8" (8)

Nipple, 3/4" X 4 1/2"
Long (7)

Standard Pipe Elbow,
3/4" x 90 Degrees (6)

Nipple, 3/4" X
3 1/2" Long (5)

Street Elbow,
3/4" X 90
Degrees (4)

Casting Splitter, VR
EMCO WHEATON (3)

Nipple, 3/4" X 6
1/2" Long (2)

Bushing, Reduced Hex
Head, 1" X 3/4" (1)

Shelf Cutaway

Screw Hex Head
Washer,
1/4"-20 x 1/2" (10)

Exploded View

Assembled and Exploded View

6

Remove two 8-32 screws from the nozzle boot casting. Install the vapor recovery nozzle boot
(item 17 in

“Parts List” on page 2

) with the same screws.

7

Remove two 1/4-20 bolts from the nozzle hook assembly and remove the nozzle hook. Install
the vapor recovery nozzle hook (item 18 in

“Parts List” on page 2

) with the same 1/4-20 bolts.

8

Re-install the dispenser top cover by replacing the four nuts removed in

step 3.

This manual is related to the following products: