Gasboy 9123K Vapor Rcvry Kit User Manual
Page 6

Installation of the Vapor Recovery Kit for Models 9123K and 9823K
Page 6
MDE-4619 Vapor Recovery Kit Installation Instructions for Models 9123K and 9823K • December 2006
Figure 1:
Assembled View
Grommet, 1.5" OD x
7/8" (8)
Nipple, 3/4" X 4 1/2"
Long (7)
Standard Pipe Elbow,
3/4" x 90 Degrees (6)
Nipple, 3/4" X
3 1/2" Long (5)
Street Elbow,
3/4" X 90
Degrees (4)
Casting Splitter, VR
EMCO WHEATON (3)
Nipple, 3/4" X 6
1/2" Long (2)
Bushing, Reduced Hex
Head, 1" X 3/4" (1)
Shelf Cutaway
Screw Hex Head
Washer,
1/4"-20 x 1/2" (10)
Exploded View
Assembled and Exploded View
6
Remove two 8-32 screws from the nozzle boot casting. Install the vapor recovery nozzle boot
(item 17 in
) with the same screws.
7
Remove two 1/4-20 bolts from the nozzle hook assembly and remove the nozzle hook. Install
the vapor recovery nozzle hook (item 18 in
) with the same 1/4-20 bolts.
8
Re-install the dispenser top cover by replacing the four nuts removed in