Gasboy Submersible Drv Relay Kit User Manual
Page 6

Installing the Atlas Submersible Drive Relay Kit
Page 6
MDE-4596 Atlas™ Submersible Drive Relay Kits (M05816K00X) Installation Instructions · August 2006
4
Pull the connector off P1 on the power supply. After a few seconds, reconnect P1.
P1
5
Attach the relay module to the platform base using M4 screws.
CPU
Power
supply
Pulser
Single
Dual
Main
Conduit
Micro
power
Lights
Heater
Pulser
K1-1
K1-2
K2-1
K2-2
L bracket
Relay
1
Relay
2
Note: Single dispensers will use only relay 1, whereas twins will use both relays (1 and 2).
6
Attach the relay cable to P7 of the display CPU board.
7
Locate the 14 gauge red and blue wires coming from the AC conduit under the platform
(marked K1-1 and K1-2 respectively). Dual dispensers will also use the 14-gauge orange and
black wires (marked K2-1 and K2-2 respectively).
8
Attach the red wire to screw terminal #1 and the blue wire to screw terminal #2 of relay #1.
Attach the orange wire to screw terminal #1 and the black wire to screw terminal #2 of relay
#2.
9
Complete the wiring between the breaker panel, pump and AC J-Box as shown in FE357B
Atlas Pump Retail/Commercial Field Wiring Diagram.