beautypg.com

Completing the installation, 1 replace and lock the lower panel, Important information – Gasboy Ultra-Hi Mech Totalizer Kit User Manual

Page 6

background image

Atlas

is a trademark of GASBOY.

KEPS

®

is a registered trademark of Illinois Tool Works Inc. Spirol

®

is a registered trademark of Spirol International Holding Corporation.

© 2006 GASBOY
7300 West Friendly Avenue - Post Office Box 22087
Greensboro, North Carolina 27420
Phone 1-800-444-5529 -

http://www.gasboy.com

-Printed in the U.S.A.

MDE-4568 Atlas Ultra-Hi Mechanical Totalizer Kit Installation Instructions · April 2006

Installing the Mechanical Totalizer Kits M06943KXXX

5

Install the other end of the cable assembly (with larger mounting hole) to the existing meter
with the Cotter pin, as shown in

Figure 2

.

Figure 2: Meter/Pulser Assembly

Totalizer Drive

Tie-Wrap
(Q10178-10)

Cotter Pin (K02137-29)

6

Attach the tie-wraps around the plastic cable cover and the conduit.

IMPORTANT INFORMATION

Allow some slack in the cable (at the meter end) to prevent excessive stress and premature
breakage during operation. Loop should be gradual with no less than a 6” radius.

Completing the Installation

1

Replace and lock the lower panel.

2

Inform the manager/owner that power will be restored to the unit and then restore power using
normal procedures.

3

Remove the lockout/tagout and return to normal operation.