Gasboy Battery Heater Kits User Manual
Introduction, Intended users, Required reading
![background image](https://www.manualsdir.com/files/787386/content/doc001.png)
MDE-4555 Atlas™ Battery Heater Kits (M06897K00X) Installation Instructions · March 2006
Page 1
Introduction
This manual provides instructions to install the Battery Heater Kit (M06897K00X) for 120
VAC and 240 VAC in Atlas
™
units.
Intended Users
This manual is intended for Gasboy Authorized Service Contractors (ASCs).
120 VAC AND 240 VAC Heater Kits
Kit No.
Description
M06897K001
120 VAC Heater Kit
M06897K002
240 VAC Heater Kit
Required Reading
Before installing a kit, the installer must read, understand, and follow:
• This manual
• NFPA 30A, The Automotive and Marine Service Station Code
• NFPA 70, The National Electric Code
• Applicable federal, state and local codes and regulations
Failure to do so may adversely affect the safe use and operation of the equipment.
Note: This kit must be installed by a Gasboy ASC to ensure warranty.
Required Tools
• # 2 Phillips
®
screwdriver
• # 1 Phillips screwdriver
MDE-4555
Atlas
™
Battery Heater Kits (M06897K00X)
Installation Instructions
March 2006
Document Outline
- Introduction
- Important Safety Information
- Installing the Atlas Battery Heater Kit
- Preparing for the Installation
- Installing the Atlas Battery Heater Kits
- 1 Unlock and remove the front panel.
- 2 Remove the two screws securing the bezel assembly and remove the assembly.
- 3 Remove the two screws securing the display panel and pivot display panel down. The unit will swing forward and down after screws are removed.
- 4 Locate and identify the following parts in the Heater Kit:
- 5 Secure the thermostat to the standoffs using 6-32 screws.
- 6 Remove the adhesive backing from the heater strip. Press the heater strip to the upper barrier plate. Install the flat washers, place the heater cover plate, and secure it with two M4 screws. You may have to move the pulser to do this.
- 7 Connect the heater cable to the power bracket connector labeled HEATER.
- Completing the Installation
- 1 Reassemble pump (fasten display panel in place, install and secure the bezel assembly, and install and lock the front panel).
- 2 Inform the manager/owner that the circuit breakers for MICRO, LIGHTS and FEED will be turned on and then turn them on.
- 3 Remove the lockout/tagout and return to normal operation.