background image

Installing the Rain Baffle Air Gap Kits

© 2006 GASBOY
7300 West Friendly Avenue • Post Office Box 22087
Greensboro, North Carolina 27420
Phone 1-800-444-5529 •

http://www.gasboy.com

• Printed in the U.S.A.

MDE-4548 Atlas™ Rain Baffle Air Gap Kit M06804K002 Installation Instructions • February 2006

.

Atlas

is a registered trademark of Gasboy.

4

Replace the old lower door panel (refer to

Figure 2 on page 3

) with the new door panel (refer

to

Figure 4

and

Figure 5 on page 4

).

5

Repeat steps

1

-

4

on the opposite side of the unit, if the lower door panel on that side needs to

be replaced.

Completing Installation

Inform the manager/owner that power will be restored to the unit and then restore power using
normal procedures. Remove the lockout/tagout and return to normal operation.