Gasboy 9800A Series User Manual
Page 66

GASBOY Series 9800A
5-6
03/07/03
REPLACING THE CPU PCB
1.
Disconnect all cables [1] from the CPU PCB.
2.
If an optional RS-485 or Pump I/F PCB is installed, remove the two Phillips screws [2]. Pull
the optional PCB off of the CPU PCB.
3.
Remove the screws from the CPU PCB and unsnap PCB from standoffs.
4.
Remove the program IC from socket U18 [3] and the memory IC from socket U19 [4] of the
defective CPU PCB by gently prying with a slotted screwdriver.
5.
Install the old program IC and memory IC into sockets U18 and U19 on the new CPU PCB.
Be careful to observe proper pin orientation.
6.
Reverse Steps 1 through 3 to install the new CPU PCB.
7.
Verify that the switch settings on the new CPU PCB are correct. See the switch settings in
Section 3, Electronic Head Assembly for verification.
- 216S (18 pages)
- Atlas Fuel Systems Site Prep Manual (42 pages)
- Atlas Technician Programming Quick Ref (2 pages)
- ATC M05819K00X Kits (28 pages)
- Atlas Fuel Systems Owner Manual (80 pages)
- Gilbarco Global Pumping Unit Operation Manual (42 pages)
- 26 (7 pages)
- Atlas Valve Replacement Kits (10 pages)
- Atlas Fuel Systems Installation Manual (100 pages)
- 9120K (8 pages)
- 9820K (6 pages)
- Atlas Single Std. Inlet Centering Kit (8 pages)
- 8800 Atlas (1 page)
- 9120K Series Service Manual (40 pages)
- 9800A Atlas (6 pages)
- 9800 Atlas (14 pages)
- 9800 Atlas (20 pages)
- M08400 (6 pages)
- 9100 Series (8 pages)
- 9820K Series Installation (62 pages)
- 9853K (8 pages)
- 9216KTW (36 pages)
- Recommended Spare Atlas (14 pages)
- DEF Atlas (28 pages)
- 9820K Series (12 pages)
- 9800Q (1 page)
- Q Series (3 pages)
- 8753E (2 pages)
- 9152AXTW2 (1 page)
- 8800E (2 pages)
- 8800E (1 page)
- 9820Q Series (1 page)
- Atlas Start-up (230 pages)
- 2600A (2 pages)
- 9800Q Front Load Vapor (2 pages)
- 215A (1 page)
- 9800A (4 pages)
- 9820A (1 page)
- 2600A (3 pages)
- 2600A (12 pages)
- 216A (31 pages)
- 215A (2 pages)
- 9800Q Vapor (2 pages)
- Lamp Kit (2 pages)
- 9120Q Pulser (1 page)