Operating sequence – Gasboy 215A User Manual
Page 27

03/07/03
5-1
Section 5
OPERATING SEQUENCE
1. AC power (115 VAC/230 VAC Int'l) must be provided to the submersible feed and slow
flow/reset motor feed. If a submersible starter relay is used, AC power (115 or 230 VAC)
must be supplied to the input contacts of the submersible starter relay.
2.
The user begins to dispense product.
3. At the master dispenser, the register displays the total volume. If an optional pulser kit is
attached, it will be supplying pulses which may be recorded by an external monitoring
system.
4.
The fueling transaction continues to run until the user turns off the dispenser handle.
This manual is related to the following products: