Tilt bed installation – DR Power Tow-Behind 8.00 Premier (Pre-August 2010) User Manual
Page 19
CONTACT US AT
www.DRPower.com
or CALL TOLL FREE 1-800-DR-OWNER 15
Tilt Bed Installation
The following procedure includes all of the steps necessary for the installation of the Tilt Bed on the DR
LEAF and LAWN VACUUM.
NOTE: The plastic Tilt Bed is mounted loosely on the Frame to allow for expansion of the plastic.
1. Place the Tilt Bed on the Trailer Frame with the mating Hinges at the same end.
Tip: Block the Wheels to keep the machine from rolling away.
2. Align the left Hinge on the Tilt Bed with the left Hinge on the Trailer Frame (Figure 3).
3. Insert a Clevis Pin through the mated Hinges and secure with a Hitch Clip (Figure 3).
Tip: Tilt the bed back for ease of inserting the Clevis Pins.
4. Repeat Step 3 for the right side Hinges.
5. Secure the Tilt Bed in the down position before proceeding with the Collector Box installation by
hooking the Flexible Dump Latch into place (Figure 4).
Figure 3
Figure 4
Pull Up and
Hook Latch
Hitch Clip
Tilt Bed
Mated Hinges
Clevis Pin
Tilt Bed Handle
Hitch Clip
Dump Latch