beautypg.com

2 start-up sequence xe "start-up sequence, 3 post installation checklist, Start-up sequence – Daktronics GPR-12EV-RGB User Manual

Page 26: Post installation checklist, 2 start-up sequence

background image

20

Start-up Procedure

5.2 Start-up Sequence

Each time the display is turned on, an initialization sequence runs.

Attribute and Description

Example

Current Firmware Version Running on Display

M4-GalaxyProRev 4.X.X

Current Root File System Version Running on Display

Rfs X.X.X

Display Size

Row x Column

Display Color Type

Bit Depth of Display

RGB

32

Currently Configured Time Zone

America/North Dakota/Center

Current IP Address of Display

Varies

Name of Web Service and Port It Currently Runs On

Srvc: DisplayConfig

Port: 4500

Name of Web Service and Port It Currently Runs On

Srvc: DisplayStatus

Port: 4501

Name of Web Service and Port It Currently Runs On

Srvc: PlayControl

Port: 4502

Name of Web Service and Port It Currently Runs On

Srvc: SecurityManagement

Port: 4503

Name of Web Service and Port It Currently Runs On

Srvc: FileTransfer

Port: 4504

Name of Connected Sensor and Its Offset (Address)

Sensor: TEMP

Offset: Addr: 1

Name of Connected Sensor and Its Offset (Address)

Sensor: LIGHT_LUX

Offset: Addr: 2

User-Defined Display Description

East Employee Entrance

The order of services and sensors is subject to change. After the initialization sequence is

complete, the display will blank. A single pixel will flash in the lower right corner of the

display to show that the display has power, but no presentations are currently running.

5.3 Post Installation Checklist

Verify the following after starting the display:

Assure all ventilation fans are fully operational.

Inspect all intake and exhaust vents for obstruction.

Confirm proper communications from the control computer to the display(s).

Assure proper communications between display faces when applicable.

This manual is related to the following products: