beautypg.com

Section 6, System start-up procedure, Boot sequence – Daktronics Rear-Ventilated GalaxyPro GP3 Series User Manual

Page 16: Start-up checklist, 1 boot sequence, 2 start-up checklist

background image

11

System Start-Up Procedure

Section 6: System Start-Up Procedure

Displays show a boot sequence about two minutes after power is turned. This information is very useful

when configuring the display in Venus

®

1500 software. Prior to turning the display on, make sure display

communications and any network connections have been made.

6.1 Boot Sequence

Description

Firmware Name and Version
Display Size (Pixels High by Pixels Wide)
DHCP Name Assigned
IP Address and State
MAC Address
Configuration Port
Status Port
Management Port (Used to Access Configuration)
Description

6.2 Start-Up Checklist

Confirm power is correctly connected to the display

Confirm there is sufficient power according to display requirements

Confirm a main disconnect is installed

Confirm the display is connected to an earth-ground electrode with a resistance of 10 ohms or

less

Confirm that all communication equipment is installed according to provided documentation

Confirm that any necessary network connections have been made

Confirm the control computer has Venus

®

1500 software installed

Inspect peripheral equipment (temperature sensor, light sensor, etc.) for proper installation