Section 6, System start-up procedure, Boot sequence – Daktronics Rear-Ventilated GalaxyPro GP3 Series User Manual
Page 16: Start-up checklist, 1 boot sequence, 2 start-up checklist

11
System Start-Up Procedure
Section 6: System Start-Up Procedure
Displays show a boot sequence about two minutes after power is turned. This information is very useful
when configuring the display in Venus
®
1500 software. Prior to turning the display on, make sure display
communications and any network connections have been made.
6.1 Boot Sequence
Description
Firmware Name and Version
Display Size (Pixels High by Pixels Wide)
DHCP Name Assigned
IP Address and State
MAC Address
Configuration Port
Status Port
Management Port (Used to Access Configuration)
Description
6.2 Start-Up Checklist
• Confirm power is correctly connected to the display
• Confirm there is sufficient power according to display requirements
• Confirm a main disconnect is installed
• Confirm the display is connected to an earth-ground electrode with a resistance of 10 ohms or
less
• Confirm that all communication equipment is installed according to provided documentation
• Confirm that any necessary network connections have been made
• Confirm the control computer has Venus
®
1500 software installed
• Inspect peripheral equipment (temperature sensor, light sensor, etc.) for proper installation