beautypg.com

Chapter 2. installation, 1 unpacking and inspection – Comtech EF Data CRS-280L User Manual

Page 29

background image

2–1

Chapter 2. INSTALLATION

2.1

Unpacking and Inspection

The CRS-280L L-Band IF Switch for 1:N Redundancy and its Installation and Operation Manual
are packaged and shipped in a pre-formed, reusable cardboard carton containing foam spacing for
maximum shipping protection.

CAUTION

IMPORTANT

Do not use any cutting tool that will extend more than 1” into the container
and cause damage to the unit.

Be sure to keep all shipping materials for the carrier's inspection.

Unpack and inspect the CRS-280L as follows:

Step

Procedure

1

Inspect shipping containers for damage.

2

If shipping containers are damaged, keep them until the contents of the shipment
have been carefully inspected and checked for normal operation.

3

Remove the packing list from the outside of the shipping carton.

4

Open the carton and remove the contents.

5

Check the contents against the packing list to verify completeness of the shipment.

6

If damage is evident, contact the carrier and Comtech EF Data immediately and
submit a damage report.

7

If the unit needs to be returned to Comtech EF Data, use the original shipping
container.