beautypg.com

Connecting the fryer to the gas supply, Moving the fryer – Belshaw Adamatic Mark II-Gas Donut Robot User Manual

Page 47

background image

Belshaw Bros., Inc.

• www.belshaw.com • Phone 206-322-5474 • Fax 206-322-5425

Donut Robot Mark II-Gas TS

MN-1018EN

7

Connecting the Fryer to the
Gas Supply

1. Ask your local gas company to advise you

on the size of pipe and gas meter you should
use.

2. Connect the fryer to the building’s gas

supply.

3. Seal all threaded joints between gas pipes

with pipe joint compound. You must use a
compound that resists the action of liquefied
petroleum (LP) gases.

4. Bleed the gas lines of all air.

5. Check all gas connections and fittings for

leaks using a gas leak detector, a soap
solution, or a similar substance. When such
a substance is applied to connections and
fittings, bubbles indicate gas leaks.

Moving the Fryer

If you ever want to move the fryer to a different
workstation, follow this procedure:

1. Turn off the machine and disconnect it from

the power source. Unplug the cutter head
power cord.

2. Turn off the gas supply. Disconnect the

machine from the gas supply.

3. Allow the machine and the shortening to

cool.

WARNING

Do not touch hot shortening. It can cause

serious burns.

4. Remove and set aside the plunger, the

hopper, and the cutter head, in that order.

5. Disconnect the swing connecting rod.

6. Remove the shortening from the fryer as

explained in “Removing the Shortening” in
Section 2 of the Operator's Manual.

7. To avoid dropping the machine or getting

shortening on the floor, wipe excess
shortening off of the fryer and the conveyor.

WARNING

Thoroughly clean and dry the floor if

shortening is spilled. Materials on the floor

can cause people to slip or fall, resulting in

serious injury or loss of life.

8. Set aside the conveyor.

9. Remove the nuts and bolts that hold the

control box in place. Remove the control
box from the fryer.

10. To prevent tripping, coil the power cord.

Move the control box to the new work
station.

11. Move the fryer to its new location.

12. Install the control box.

13. Move and install the conveyor.

14 Move and install the swing column.

Connect the swing connecting rod.

15. To prevent tripping, coil the cutter head

power cord. Move and install the cutter
head.

16. Move and install the hopper and the plunger.

17. Level and secure the fryer.

18. Connect the fryer to the building’s gas

supply, and seal all pipe joints with joint
compound.