Steps for Finalizing the Installation
1. Remove the glass (see page 40).
NOTE: If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3. Make sure the accent light bulb is in place.
NOTE: Take care to not touch the bulb with your fingers (use a cloth or paper towel).
4. Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case
the household (AC) power goes out and are required for operation. Install three AAA batteries into
the remote (see illustration below). Synchronize the transmitter to the IFC (see the Owner’s Manual
for details).