beautypg.com

Artesyn COMX-P40x0 ENP2 Installation and Use (August 2014) User Manual

Page 30

background image

Hardware Preparation and Installation

COMX-P40x0 ENP2 Installation and Use (6806800R95B)

30

Shipment Inspection

1. Verify that you have received all items of your shipment.

Printed Quick Start Guide and Safety Notes

COMX-P40x0 ENP2 Module

2. Check for damage and report any damage or differences to customer service.

3. Remove the desiccant bag shipped together with the enclosure and dispose of it

according to your country’s legislation.

2.3

Installing and Removing the Module on the

Carrier Board

The heat sink is assembled to the module before the procedure below:

Installing the COM module on the carrier board

1. Line up the board-to-board connector of the module assembly with the board-to-board

connector of the carrier board.

2. Make sure that the inter-connectors are properly aligned and that the five standoffs on the

module have contact with the top of the carrier board.

Improperly disposing of used products may harm the environment.
Always dispose of used products according to your country’s legislation and manufacturer’s
instructions.

The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.