beautypg.com

Change calibration date -64, Procedures -64, Constant-current mode -64 – AMETEK SGI Series User Manual

Page 116

background image

Calibration and Verification

Sorensen SGI Series

4-64

M550221-01 Rev AA

11. Turn off AC power, and remove all connections to the remote analog

control connector (J1), except the jumper between Pins J1-5 and J1-6;
ensure that they are jumpered to enable the output, and allow front panel
control.

4.2.4 Change Calibration Date

To change the calibration date stored in memory, issue the following SCPI
commands (see SG Series Programming Manual for command details)
through the remote digital interface, either RS-232, GPIB, or Ethernet:

V

IA

RS-232

OR

GPIB

CAL:UNLOCK “6867”

CAL:DATE YYYYMMDD

CAL:STORE

CAL:LOCK

V

IA

E

THERNET

CAL:UNLOCK “6867”

CAL:MOD;LASTCALDATE MM DD YYYY

CAL:MOD:NEXTCALDATE MM DD YYYY

CAL:STORE

CAL:LOCK

4.3

Remote Isolated Analog Interface (Option)
Calibration and Verification Procedures

6.

CAUTION!

Hazardous voltages may be present on the output, even after it is
disabled, due to stored capacitive charge. Disconnect the mains AC
input, and allow 5 minutes to drain the output capacitive charge to
safe levels before connecting or removing output wiring.

4.3.1 Constant-Current Mode

1. Disconnect AC mains power to the unit. Setup the SGI Series unit to

operate with remote current programming using an external 0-5 VDC
voltage-source, as shown in Figure 3-15 in Section 3.10. Ensure that Pins
J1-5 and J1-6 are jumpered to enable the output.