Installation introduction, 8 installation, 1 stand-up mount installation (standard setting) – AVUE G55IR-WB36N – Outdoor 36X Long Range IR PTZ User Manual

Page 53: 3 wall mount installation (non standard setting), 2 top-down mounting (non standard setting)

background image

Pillar

Iron plate

Using the bedplate of PTZ as a model to draw the pos-
ition of bores which are on the iron plate. Then fix the
PTZ on the iron plate by M6 screw. (Refer to picture

11.8-2)

11.8 Installation

Stand-up mount top-dowm mount and wall mount

are available for this product, which are suitable for
different installation environment. Because this product

is integrated package, please set parameters of baud rate,

control protocol as well as PTZ IP address by setting sw-
itch number before any installation. Please refer to

in appendix.

setting of switch number”

11.8.1 Stand-up Mount Installation

(Standard setting)

1. Installation place must meet the requirements

of wiring safety of 11.2 chapter.

2. Installation pole must be strong and stable,

which is not easy to shake.

Setting switch number of PTZ

,

setting

baud rate, control protocol and IP address of PTZ
camera according to

in

appendix of user manual.

setting of switch number”

Picture11.8-2

Picture11.8-1

11.8.3 Wall Mount Installation (Non
standard setting)

1. Installation position must enable to undertake

high weight pressure, which is 4 times of total

weight of PTZ ,bracket and bedplate.

2.Wall must be strong and stable; bracket must

be ensured to install on clear wall.

Using wall bracket of PTZ as a model to confirm
the position of bores which are on the wall. (Refer
to picture 11.8-4)

11.8.2 Top-down Mounting (Non
standard setting)

Iron plate

Picture11.8-3

Using the bedplate of PTZ as a model to draw the
position of bore which are on the iron plate. (Refer to
Picture 11.8-3) Then fix the top-down PTZ on the
iron plate by M6 screw.

1.the mounting position must enable to undertake

the weight of PTZ.

2.Such a mounting way is only suitable for top-

down type. Otherwise, it would be water-leaking.

Picture11.8-4

Installation Introduction

Drill 4 pieces of bores which are M8 metal inflation
bolts in surface of wall ; the depth of bore should be
approximately 75mm, and fixing with M8 inflation
bolts. (Refer to picture 11.8-5)

5 0