beautypg.com

Preparing for operation, 1 setting the station address, 6commissioning – Pilz PNOZ mmc3p DP User Manual

Page 20: 2 preparing for operation

background image

6.2

Preparing for operation

6

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

6-2

6.2

Preparing for operation

6200

Preparing for operation

6-

6.2.1

Setting the station address

Setting the station address

6-

Verdrahtung_multi_Feldbus_Stationsadresse einstellen_Profibus

The station address of the expansion module PNOZ mmc3p is set be-

tween 0 ... 99 (decimal) via two rotary switches x1 and x10.

On the upper rotary switch x10, use a small screwdriver to set the

tens digit for the address (“3” in the example).

On the lower rotary switch x1, set the ones digit for the address (“6”

in the example).

Station address 36 is set in the diagrams as an example.

6.2.2

Download modified project to the control system PNOZmulti

Download modified project to the control system PNOZmulti

6-

Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA

As soon as an additional expansion module has been connected to the

system, the project must be amended using the PNOZmulti Configura-

tor. Proceed as described in the operating instructions for the base unit.

NOTICE

For the commissioning and after every program change, you

must check whether the safety devices are functioning correctly.

1234

9

8

7

6

0

5

x10

1234

9

8

7

6

0

5

x1