Preparing for operation, 6commissioning, 2 preparing for operation – Pilz PNOZ mmc1p ETH User Manual

Page 20

background image

6.2

Preparing for operation

6

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

6-2

6.2

Preparing for operation

6200

Preparing for operation

6-

_Dummy-Vorlage

Detection and activation of the Ethernet interface, depending on the

USB interface on the base unit:

`

USB interface on the base unit not connected

If the USB interface on the base unit is not connected, the Ethernet

interface will be detected and activated by the base unit as soon as

the communication module has been connected to the base unit.

`

USB interface on the base unit connected

If the USB interface on the base unit is already connected, the "Eth-

ernet" interface will first need to be selected on the base unit display

to enable the Ethernet interface on the base unit to be detected and

activated (see operating manual for the base unit for details of the

setting).

6.2.1

Download modified project to the PNOZmulti safety system

Download modified project to the PNOZmulti safety system

6-

Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA

As soon as an additional expansion module has been connected to the

system, the project must be amended using the PNOZmulti Configura-

tor. Proceed as described in the operating instructions for the base unit.

NOTICE

For the commissioning and after every program change, you

must check whether the safety devices are functioning correctly.