Martin Christ RVC 2-25 CDplus User Manual
Page 36
![background image](/manuals/739297/36/background.png)
RVC 2-25 CD&
6 Operation
36
Version 11/2008, Rev. 2.2 of 04/12/2013 • sb
Translation of the original operating manual
Pos: 131 /20 0 Ch rist/3 70 RVC-BA (S TANDARDMODULE) /06 0 Betri eb/0 60- 004 0-0 030 -00 30 B eche r @ 8 \mo d_1 309 500 943 610 _68. docx @ 46 836 @ 4 @ 1
6.4.3.3 Buckets
• Load each bucket symmetrically to its pivotal point to ensure swinging
to 90° under rotation.
correct
incorrect
at a standstill
under rotation
Fig. 16: Symmetrical loading of the buckets
• The balance point of the loaded bucket must be located considerably
below the pivotal point. If the balance point is too near the pivotal point,
the loaded bucket can be levered out of the bearings.
correct
incorrect
at a standstill
1
Pivotal point
2
Balance point
under rotation
Fig. 17: Loading of buckets considering the balance point
Pos: 132 /01 0 Univ ersal mod ule/ Ab schnitt swechs el @ 0 \mo d_1 202 124 514 062_ 0.d ocx @ 418 @ @ 1
Pos: 133 /01 0 Univ ersal mod ule/ Sei tenwe chsel @ 0\ mod _12 021 1624 431 2_0 .docx @ 1 05 @ @ 1