Maintenance, Maintenance schedule, Maintenance maintenance schedule – Labconco WaterPr BT Systems 90153 Series User Manual
Page 45

37
Maintenance
Maintenance Schedule
In order to maintain good performance of your water system respect the maintenance schedule and replace
consumables as required.
What to do
When?
How to?
Filter Pack
Replacement
When the Pack
Alarm display is
blinking.
See Section How
to Replace the
Filter Pack
Cartridge
When the system
resistivity display
is blinking.
After a system or tank sanitization.
Final Filter
Replacement
The Final Filter is replaced when the Filter
Pack cartridge is replaced or when the
Product Water flowrate drops.
See Section How
to Replace the
Final Filter
Vent Filter
Replacement
Replaced when the Filter Pack cartridge is
replaced.
See Section
Installation of the
Vent Filter
Flow
Calibration
When the Final Filter is replaced, or
periodically.
See Section
Installation and
Rinsing of the
Tank Level
Calibration
Periodically.
See Section How
to Calibrate the
Tank Level (C04)
UV Lamp
Replacement
and UV Timer
Reset
When the UV
Lamp Alarm
display is
blinking.
See Sections How
to Replace the UV
Lamp (UV System
only) and How to
View or Reset the
UV Lamp Timer
(C05).