Setup, Rt100 powershift operator’s manual – Ditch Witch RT100 User Manual
Page 89

Backhoe - 88
RT100 Powershift Operator’s Manual
Setup
CMW
Setup
1.
Move F-N-R lever to neutral position.
2.
Press service brake.
3.
Move ground drive control to neutral position.
4.
Shift gearbox control to 1 (low).
5.
Lower rear attachment to 6” (150 mm) above ground.
6.
Check that backfill blade is straight and lower it to ground.
7.
Decrease engine speed to low throttle.
8.
Move to backhoe operator’s station.
9.
Lower stabilizers enough to lift front tires.
10. Remove swing lock pin from hole (1) and store in
hole (2).
11. Raise boom to release tension on stow lock.
12. Release stow lock by pushing handle forward.
13. Adjust engine speed to 1/2 to 3/4 throttle for
digging.
IMPORTANT: For more information about stabilizer controls, see page 49.
IMPORTANT: For more information about
stow lock, see page 49.
NOTICE: Engine speed affects speed of
backhoe operation.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)