Rt100 powershift operator’s manual – Ditch Witch RT100 User Manual
Page 30

RT100 Powershift Operator’s Manual
Controls - 29
Center Console
CMW
10. F-N-R lever
Performs multiple functions determined
by the dig/drive control.
When dig/drive control is in dig:
•
To start forward digging chain
motion, lift up and push forward.
•
To stop digging chain, move to
center.
•
To start reverse digging chain
motion, lift up and pull back.
When dig/drive control is in drive:
•
To travel forward, lift up and push
forward.
•
To stop, move to center.
•
To travel in reverse, lift up and pull
back.
To change dig or drive speeds:
•
For high speed, rotate to H.
•
For low speed, rotate to L.
IMPORTANT: When driving,
stop tractor before shifting
between forward and reverse.
11. Horn
To sound horn, press.
Item
Description
Notes
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)