Rt100 powershift operator’s manual – Ditch Witch RT100 User Manual
Page 84

RT100 Powershift Operator’s Manual
Trench - 83
Setup
CMW
1.
If using optional trench cleaner, remove bolt installed for transport.
2.
Fasten and adjust seatbelt.
3.
Start tractor. See page 68 for start-up procedures.
4.
Drive to starting point. Move in line with planned trench. See page 70 for driving procedures.
5.
Apply service brake.
6.
Engage parking brake and verify parking brake indicator is on.
7.
Release service brake.
8.
Move F-N-R lever to neutral.
9.
Move dig/drive control to dig position.
10. Twist F-N-R lever to 1 (low).
11. Lower backfill blade.
12. Tilt steering column up.
13. Turn seat to the desired position.
14. Engage axle lock.
15. Lower boom to just above ground.
16. Check that boom is in line with planned trench.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)