Tie down, Points, Procedure – Ditch Witch RT100 User Manual
Page 76: Rt100 powershift operator’s manual
RT100 Powershift Operator’s Manual
Transport - 75
Tie Down
CMW
Tie Down
Points
Tiedown points are identified by tiedown decals. Securing to trailer at other
points is unsafe and can damage machinery.
Procedure
Tractor
Attach chains at front and rear tiedown points.
Make sure chains are tight before transporting
unit.
Trencher
Lower trencher to trailer deck and chain at
attachment frame and through boom. Make
sure chains are tight before transporting.
Read operator’s manual. Know how to use all controls before operating
machine. When you see this sign
on the machine or in the manual, read it and use
caution. Your safety is at stake.
IMPORTANT: If trencher is equipped with a
trench cleaner, ensure that trench cleaner
shoe is fully up and extra bolt (found in
operator’s manual compartment) is installed
in appropriate hole for additional support.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)