Unit – dual cycle refrigerated air conditioning, Ductwork, Site – Bonaire LV User Manual
Page 37: Customer hand over

Multi-Appliance Manual Control
Controls – Installation / Setup / Commissioning
Fan speed set is correct.
Burner pressure is correct.
Mounting pad/platform complies with requirements / codes.
U
NIT
–
D
UAL
C
YCLE
R
EFRIGERATED
A
IR
C
ONDITIONING
Unit Foundation correct
All pipe work is welded and vacuumed down.
Condenser Coil is purged before charging.
System is charged, all joints checked and pressures set correctly
Condenser unit is level
All clearances around the condenser set to manufacturer's specifications.
D
UCTWORK
All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5
x the ductwork diameter.
Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped
clean.
All roof penetrations are fully sealed and watertight.
Man hole cover replaced.
S
ITE
All rubbish has been removed from inside and on the roof.
C
USTOMER
H
AND
O
VER
The operation of the Controller.
The need to open windows and doors for the correct operation of Evaporative Air
Conditioning
The operation of the bleed or dumping system and it’s importance to operate at all times in a
ducted evaporative air conditioner.
Maintenance requirements
Bonaire Control Systems