Carrier 26H User Manual
Automatic icemaker
Table of contents
Document Outline
- INSTALLATION
- AND
- SERVICE
- INFORMATION
- Carrier
- CONTENTS
- 26H
- 26H3
- 26H5
- À 1
- 1. CHECK SHIPMENT
- STORAGE BIN CRATE
- HEAT INTERCHANGER PACKAGE
- STORAGE BIN PARTITION
- 2. SELECT PROPER LOCATION
- 3. MOVE UNIT TO LOCATION
- 26H
- INSTALLATION
- Carrier
- 4. UNCRATE THE BIN
- 5. INSTALL LEVELING SCREWS
- 6. UNPACK AND MOUNT THE HEAT INTERCHANGER
- 7. MOVE THE BIN TO APPROXIMATE LOCATION
- 8. UNCRATE THE MACHINE SECTION
- 9. REMOVE THE FRONT TOP, AND SIDE PANELS
- 10. PLACE MACHINE SECTION ON TOP OF BIN AND BOLT IN POSITION
- n. BOLT TIE BAR AT REAR OF UNIT
- 12. INSTALL WATER SUPPLY AND DRAINS
- FIG. 8 - PARTS SHIPPED ON BACK OF MACHINE SECTION
- 13. MAKE ELECTRICAL CONNECTIONS
- -INPUT-
- -OUTPUT-
- FIG. n - "BUCK AMD BOOST" TRANSFORMER WIRING
- Carrier
- INSTALLATION
- 26H
- INSTALLATION
- Carrier
- 14. INSTALL BIN THERMOSTAT BULB
- RIGHT SIDE OF 26H3 SECTION - PANELS REMOVED
- 15. INSTALL CRUSHER GUARD
- 16. INSTALL SIPHON STANDPIPE AND ADJUST FLOAT
- FLOAT ASSEMBLY
- 17. REPLACE THE ICE DEFLECTOR
- 18. LOOSEN COMPRESSOR HOLD-DOWN BOLTS
- 19. START THE UNIT
- 20. CHECK OPERATION
- 21. FINAL CHECK LIST
- FREEZING CYCLE (SEE FIG. 1)
- DEFROST CYCLE (SEE FIG. 2)
- FIG. 1 - SCHEMATIC FREEZING CYCLE
- CRUSHER OPERATION
- 2. REFRIGERANT CIRCUIT
- L SHUTOFF VALVES
- 2. INSTALLING GAUGES
- FIG. 11 - CHARGING MANIFOLD ATTACHED FOR CHARGING UNIT
- 3. PUMP DOWN OF COMPRESSOR
- 4. CHARGING WITH REFRIGERANT
- 5. OPERATING PRESSURES
- 6. COMPRESSOR
- 7. LIQUID-SUCTION INTERCHANGER AND ACCUMULATOR REPLACEMENT
- 8. DRYER REPLACEMENT
- 9. CONDENSER CLEANING AND REPLACEMENT
- FIG. 15 - REQUIRED FOR CONDENSER CLEANING
- 10. EVAPORATOR REPLACEMENT
- 3. FREEZING WATER CIRCUIT
- 4. ELECTRICAL CIRCUIT
- ICE MAKER SERVICE CHECK LIST
- SERVICE ANALYSIS 26H5 AND 26H3 UNIT WILL NOT OPERATE
- Carrier
- SERVICE
- INSTALLATION
- 26H
- 26H