Replacing the interface/lvs module, S module – PRG Bad Boy Field Service Manual User Manual
Page 80

72
BAD BOY
®
SPOT LUMINAIRE FIELD SERVICE MANUAL
Replacing the Interface/LVS Module
Parts:
23.9812.0812
1 EA
ASSY, INTERFACE/LVS MODULE
Tools:
#2 Philips screwdriver
WARNING:
Remove power from luminaire before performing any maintenance procedures.
To replace the Interface/LVS Module:
Step
1. Remove power from luminaire and allow components to cool for at least 5 minutes.
Step
2. Remove Intake Cover. (Refer to
"Removing the Enclosure Covers"
Step
3. At Interface/LVS Module, remove four 10-32 x 3/8" PPB SEMS screws (Figure 3-35).
Step
4. At left side of Interface/LVS Module, disconnect the following wiring:
a.
Fan cable.
b.
APS Control Line cable.
c.
Neutral (white) cable.
d.
Line (black) cable.
e.
Ground cable.
Step
5. At right side of Interface/LVS Module, disconnect the following wiring:
a.
Fan cable.
b.
CAN Bus cable.
c.
Power cables (red and black).
Step
6. Remove Interface/LVS Module from enclosure.
Note: The battery pack cable is intentionally NOT connected. Do not re-connect.
Step
7. Replace Interface/LVS Module by doing steps in reverse.
Do not connect battery pack cable. Leave this
cable disconnected.