Section 1, Initial inspection – Toshiba VT130G1 User Manual
Page 4
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Section 1
INITIAL INSPECTION
Upon receipt of your VT130Q1, a careful Inspection for shipping damage should be
made. After uncrating, check:
1. Whether there are any parts which might be ioose, broken or separated.
2. Whether the rated capacity shown on the nameplate is the same as specified on
your order.
Periodically check the operating inverter for cleanlines?. Keep the cooling heatsink free
of debris. Check connections (with power off) for tightness. Proper maintenance and
operation will allow the inverter to give long troublefree service.
Storage
If the inverter is stored, it should be kept in a clean dry location free of temperature
extremes. Storage for longer than six months without power requires reconditioning of
the filter capacitor:
1. Apply bus voltage for a few seconds and check capacitor temperatures.
WARNING
Be sure charge light Is out before touching any component.
2. Repeat Step 1 several times monitoring capacitor temperatures, if a capacitor gets
warm, allow It to cool before repeating.
3. Capacitors are reconditioned when a constant bus voltage causes no heating.