CHAPTER 8: TROUBLESHOOTING GUIDE

PR2: 04/22/13 Page 93 of 160


Benchmark 2.0LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0052_0E

GF-127

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

TABLE 8-1. BOILER TROUBLESHOOTING (Continued)

FAULT INDICATION

PROBABLE CAUSES

CORRECTIVE ACTION

STEPPER MOTOR

FAILURE

(continued)

2. Air/Fuel Valve unplugged.

3. Loose wiring connection to the

stepper motor.

4. Defective Air/Fuel Valve stepper

motor.

5. Defective Power Supply Board or

fuse

6. Defective IGST Board

2. Check that the Air/Fuel Valve is connected to the Control Box.

3. .Inspect for loose connections between the Air/Fuel Valve motor

and the wiring harness.

4. Replace stepper motor.

5. Check DS1 & DS2 LEDs on Power Supply Board. If they are not

steady ON, replace Power Supply Board.

6. Check “Heartbeat” LED DS1 and verify it is blinking ON & OFF

every second. If not, replace IGST Board.

8.2 ADDITIONAL FAULTS WITHOUT SPECIFIC FAULT MESSAGES

Refer to Table 8-2 to troubleshoot faults which may occur without a specific fault message being displayed.

TABLE 8-2. BOILER TROUBLESHOOTING WITH NO FAULT MESSAGE DISPLAYED

OBSERVED INCIDENT

PROBABLE CAUSES

CORRECTIVE ACTION

Hard Light-Off

1. Staged Ignition Ball Valve closed.

2. Clogged/damaged Gas Injector

(Figure 8-2).

3. Defective Staged Ignition Solenoid

(Figure 8-2).

1. Open the 1/4” Ball Valve downstream of the SSOV (Fig. 8-1).

2. Remove and inspect Gas Injector to ensure it is not clogged or

damaged.

3. Close the 2” and the 1/4” Ball Valve downstream of the SSOV (Fig. 8-

1). Start the unit and listen for a “clicking” sound that the Staged
Ignition Solenoid makes during Ignition Trial. If “clicking” sound is not
heard after 2 or 3 attempts, replace the Staged Ignition Solenoid.

Fluctuating Gas Pressure

1. Gas pressure going into unit is

fluctuating.

2. Damping Orifice not installed.


1. Stabilize gas pressure going into unit. If necessary, troubleshoot

Building Supply Regulator.

2. Check to ensure that the Damping Orifice is installed in the SSOV

Actuator shown in Figure 8-3. (For IRI Gas Trains, the Damping Orifice
is installed in the downstream SSOV Actuator).

Air/Fuel Valve “hunting” at

the 80% Valve Position

1. IGST and Power Supply Boards in

Control Box are outdated.

1. Check to ensure that the IGST and Power Supply Boards are Rev. E

or higher.