APPENDIX I: RECOMMENDED PERIODIC TESTING CHECK LIST

WARNING

NOTE: Periodic testing of all boiler controls and safety devices is required to determine that they are operating
as designed. Precautions shall be taken while tests are being performed to protect against bodily injury and
property damage. The owner or user of an automatic boiler system should set up a formal system of periodic
preventive maintenance and testing. Tests should be conducted on a regular basis and the results recorded in
a log-book.

Item

Frequency Provided By

Remarks

Refer to indicated paragraphs of this manual for detailed procedures

Gauges, monitors and
indicators

Daily

Operator

Visual inspection and record readings in
operator log

Instrument and
equipment settings

Daily

Operator

Visual check against factory recommended
specifications

Weekly

Operator

Verify factory settings

Firing Rate Control

Semi-Annually Service Tech. Verify factory settings

Annually

Service Tech.

Check with combustion calibration test
equipment. See paragraph 7.4 and Chapter 4.

Flue, vent, stack or
intake air duct

Monthly

Operator

Visually inspection condition and check for
obstructions

Spark Igniter

Weekly

Operator

See paragraph 7.2

Air/Fuel Valve position

Weekly

Operator

Check position indicator dial (paragraph 3.9)

SSOV Leakage test

Annually

Service Tech.

Check for leakage in accordance with the
SSOV manufacturer’s (Siemens)
recommendations.

Flame failure

Weekly

Operator

Close manual gas shutoff valve and check
safety shutdown. See paragraph 6.7

Flame signal strength

Weekly

Operator

Check flame strength using the Control Panel
Operating Menu. See paragraph 3.4.

Low water level cut off
and alarm

Weekly

Operator

See paragraph 6.4

Slow drain test

Semi-Annually

Operator

Perform a slow drain test in accordance with
ASME Boiler and Pressure Vessel Code,
Section IV.

High water
temperature safety
control test

Annually

Service Tech. See paragraph 6.5

Operating controls

Annually

Operator

See paragraph 3.2

Low air flow

Monthly

Operator

See paragraph 6.8

High and low gas
pressure interlocks

Monthly

Operator

See paragraphs 6.2 and 6.3

Air/Fuel Valve purge
position switch

Annually

Service Tech. See paragraph 6.10

Air/Fuel Valve ignition
position switch

Annually

Service Tech. See paragraph 6.11

Safety valves

As required

Operator

Check per A.S.M.E. Boiler and Pressure
Vessel Code, Section IV

Inspect burner
components

Semi-Annually Service Tech.

See paragraph 7.6

Condensate Trap

Semi-Annually

Operator