INSTALLATION

2-2



Figure 2-1 Benchmark 1.5 Boiler Clearances

WARNING

KEEP THE UNIT AREA CLEAR AND
FREE FROM ALL COMBUSTIBLE
MATERIALS AND FLAMMABLE
VAPORS OR LIQUIDS

.

CAUTION

While packaged in the shipping
container, the boiler must be moved
by pallet jack or forklift from the
FRONT ONLY.

2.4.2 Setting the Unit

The unit must be installed on a 4 inch to 6 inch
housekeeping pad to ensure proper condensate
drainage. If anchoring the unit, refer to the
dimensional drawings in Appendix F for anchor
locations. Two lifting tabs are provided at the top
of the heat exchanger as shown in Figure 2-2.
USE THE TABS SHOWN IN FIGURE 2-2 TO
LIFT AND MOVE THE UNIT. Remove the front
top panel from the unit to provide access to the
lifting tabs. Remove the four (4) lag screws
securing the unit to the shipping skid. Lift the
unit off the shipping skid and position it on the 4
inch to 6 inch housekeeping concrete pad
(required) in the desired location.

LIFTING

TAB

LIFTING

TAB

FRONT

BLOWER

AIR/FUEL

VALVE

Figure 2-2

Partial Top View Showing Lifting Tab

Locations

In multiple unit installations, it is important to
plan the position of each unit in advance.
Sufficient space for piping connections and
future service/maintenance requirements must
also be taken into consideration. All piping must
include ample provisions for expansion.