beautypg.com

Benchmark 1.5ln low nox boiler, Gf-120 – AERCO BMK 1.5 LN October 2012 User Manual

Page 5

background image



PR1: 10/18//12 AERCO International Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 5 of 166


Benchmark 1.5LN Low NOx Boiler

Installation, Operation and Maintenance Manual

OMM-0041_0E

GF-120

5.5 DIRECT DRIVE MODES....................................................................................................................... 64

5.5.1 Direct Drive Field Wiring ................................................................................................................ 65

5.5.2 Direct Drive Startup ....................................................................................................................... 65

5.6 BOILER MANAGEMENT SYSTEM (BMS) ........................................................................................... 65

5.6.1 BMS External Field Wiring ............................................................................................................. 66

5.6.2 BMS Setup and Startup ................................................................................................................. 66

5.7 COMBINATION CONTROL SYSTEM (CCS) ....................................................................................... 66

5.7.1 Combination Control System Field Wiring ..................................................................................... 67

5.7.2 Combination Control System Setup and Startup ........................................................................... 67

CHAPTER 6.

SAFETY DEVICE TESTING ..........................................................................69

6.1 TESTING OF SAFETY DEVICES ......................................................................................................... 69

6.2 LOW GAS PRESSURE FAULT TEST .................................................................................................. 69

6.3 HIGH GAS PRESSURE TEST ............................................................................................................. 70

6.4 LOW WATER LEVEL FAULT TEST ..................................................................................................... 71

6.5 WATER TEMPERATURE FAULT TEST .............................................................................................. 71

6.6 INTERLOCK TESTS ............................................................................................................................. 73

6.6.1 REMOTE INTERLOCK .................................................................................................................. 73

6.6.2 DELAYED INTERLOCK ................................................................................................................ 73

6.7 FLAME FAULT TESTS ......................................................................................................................... 73

6.8 AIR FLOW FAULT TESTS .................................................................................................................... 75

6.9 SSOV PROOF OF CLOSURE SWITCH ............................................................................................... 76

6.10 PURGE SWITCH OPEN DURING PURGE ........................................................................................ 76

6.11 IGNITION SWITCH OPEN DURING IGNITION ................................................................................. 77

6.12 SAFETY PRESSURE RELIEF VALVE TEST ..................................................................................... 78

CHAPTER 7.

MAINTENANCE ............................................................................................79

7.1 MAINTENANCE SCHEDULE ............................................................................................................... 79

7.2 IGNITER-INJECTOR ............................................................................................................................ 80

7.3 FLAME DETECTOR ............................................................................................................................. 82

7.4 COMBUSTION CALIBRATION & RSI REGULATOR ADJUSTMENT ................................................. 82

7.4.1 RSI Regulator Pressure ................................................................................................................. 82

7.5 SAFETY DEVICE TESTING ................................................................................................................. 85

7.6 BURNER ASSEMBLY INSPECTION ................................................................................................... 85

7.7 CONDENSATE DRAIN TRAP .............................................................................................................. 88

7.8 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME ....................................... 89

7.9 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED SHUTDOWN ......................... 90

CHAPTER 8.

TROUBLESHOOTING GUIDE .......................................................................91

8.1 INTRODUCTION ................................................................................................................................... 91

8.2 ADDITIONAL FAULTS WITHOUT SPECIFIC FAULT MESSAGES .................................................. 101