5 Putting into operation

59

R-220 SE Operation Manual, Version F

a

Level drain with

Ø 12 mm hose connector, let into sink.

b

Draining tap with

Ø 12 mm hose connector, let into sink.

c

Heating and cooling water source. If a water tap is used, the optional cooling water shut-off tap is recom-
mended.

d

Control cable to cooling water valve connection at the Rotavapor connection panel (rear side).

e

Routing of the cooling water supply tube:

➥ Route the tube through the free tube holes at the bath lift side plates, make sure the tube can not be

kinked or damaged by the lift mechanic!

➥ Connect the tube to the replenishment needle valve tap. Use a hose clamp to safely install the tube.

5 .15 .2

Heating transfer media with high boiling point

The use of commercially available, nontoxic medium is highly recommended. However, all supple-
mentary data sheets of the used liquids must be obtained!

Screw cap ½" (order no. 11055682)

• When using liquids with high boiling points the replenishment tap must not (!) be connected to a

water source for safety reasons.

• The level drain must be closed with the original screw cap.
• The filling level should be a fingerbreadth below the level drain output with the evaporating flask

immersed.

NOTICE

Risk of damage caused by heating transfer mediums.
• Do not fill the heating bath to overflow
• Seal drain with screw cap

NOTE
Use PTFE seal tape for a tight installation of the screw cap!