To ensure that the unit will assemble correctly, verify that the structural glazed mullion
and filler are fabricated opposite of each other. Apply butyl type sealant to the end of all
horizontal members that come into contact with the structural glazed mullion. Install
anchors into the head. Before assembly, apply wax lubricant to all STC8 fasteners.
Fasten the structural glazed mullion to all horizontal members. Fasten the opposite
vertical mullion, jamb, etc. to the other end of the horizontals. Make sure that butyl type
sealant has been applied to the other ends of the horizontal members. Ensure that
anchor straps have been installed if required. Wipe off all excess sealant.
ANCHOR
FT46 (SHOWN)
FT47 OPTIONAL
NOTE: For inside glazed systems, install
exterior glazing gasket (WC12) prior to
assembly. For outside glazed systems,
install interior glazing gasket (WNE0) prior
to assembly of units.
STRUCTURAL GLAZED
MULLION
(8320)
[FIG. 5]
HEAD
(8338)
GENERAL NOTE: If the D.L.O. is 36" wide or less, 2
strap anchors are required. D.L.O.’s greater than 36"
require 3 anchors. Anchor widths and locations
should be verified by a structural engineer for job
specific conditions.
SILL
(8343)
APPLY BUTYL TYPE SEALANT TO THE
AREA THAT CONTACTS THE VERTICAL
MULLION FILLER BEFORE ATTACHING
TO THE VERTICAL MULLION FILLER.
MULLION SNAP-IN
FILLER
(8309)
STC8
INT. HORIZONTAL
8341 (SHOWN)
8337 OPTIONAL
STRUCTURAL GLAZED MULLION SYSTEMS
STEP 4) STRUCTURAL GLAZED SYSTEM ASSEMBLY
SECTION IV - UNIT ASSEMBLY
(CON’T)
PAGE 12