Unit assembly, V subsill fabric, Fig. 1] [fig. 2 – EFCO 945 Series User Manual
Page 11: Page 9
![background image](/manuals/636030/11/background.png)
945 QUICKSET
8310
8307
KDE 11/2003
SECTION IV - UNIT ASSEMBLY
8307
JAMB
8309
VERT.
MULLION
8312
8313
VERT.
EXPANSION
MULLION
JAMB
8310
8308
FABRICATED
AS RIGHT
JAMB
SHALLOW
DEEP
POCKET
FABRICATED
AS RIGHT
INTERMEDIATE
FABRICATED
AS LEFT
INTERMEDIATE
DEEP
POCKET
FABRICATED
AS LEFT
INTERMEDIATE
SHALLOW
DEEP
POCKET
[FIG. 1]
[FIG. 2]
HN50
WALK
BLOCK
OPTIONAL
FABRICATED
AS RIGHT
INTERMEDIATE
B. Check the fabrication to ensure that the vertical mullion and vertical mullion
filler are fabricated opposite of each other. If the mullion is fabricated for the
right, the filler should be fabricated for the left. The vertical expansion mullion
should be fabricated the same way. See Fig. 2 below.
FABRICATED
AS LEFT JAMB
STEP 1) GENERAL NOTES
A. Ensure that all tooling is correct before assembly. For each D.L.O. there
should be a deep pocket and a shallow pocket. If only one D.L.O. is required,
both pockets will be deep. The glass will not be able to be loaded with two
shallow pockets. Also, keep all deep pockets on center D.L.O.'s on the same
side of the D.L.O. See Fig. 1 below.
INCLUDES CAPTURED AND STRUCTURAL GLAZED MULLION SYSTEMS
PAGE 9