beautypg.com

EFCO S5600 Inside Glazed User Manual

Page 15

background image

EFCO CORPORATION 6/2012 PART NO. Y304

Page 15 of 29

Series 5600 Inside Glazed Installation Instructions

Section IX: Glazing Preparation

Step #2 Install Gaskets into Mullions


A.) Remove glazing gaskets from the reel and allow to relax and shrink.

B.) Apply sealant into the raceway a minimum of 2” in each direction from the corner on

the exterior side of the glazing pocket. (Refer to the illustration below.)

C.) Once the gaskets have relaxed, cut and install them into position to the exterior side of

the glazing pockets. Vertical gaskets must be cut vertical D.L.O. plus 1 ¾”. Place the

gaskets into position starting at the center of the D.L.O. Crowd in the excess at the
ends.

D.) Cut the horizontal gaskets D.L.O. plus ½” and insert the gasket as indicated above.



Exterior pressure plates

Seal the gasket race and
back side of gasket 2" in
each direction at all corners

with sealant.

Joint plugs

SECTION "B-B"

2"

EDGE OF GLASS

1/2" Glass Bite

(Typical)

3/16" x 1" weep slot

end of the pressure plate.

centered 4" off each

2"

OPTIONAL WEEP HOLES

5/16” weep holes
Drill 3 side by side

centered 4” off each

end of the pressure plate.

Locate C/L of holes 5/32”

above top of tongue.

NOTE: Clean all glazing pockets prior to glazing. This is necessary to avoid clogging the

weep system as well as to prevent staining of the exterior metal and glass surface.