beautypg.com

EFCO S5600 Inside Glazed User Manual

Page 14

background image

EFCO CORPORATION 6/2012 PART NO. Y304

Page 14 of 29

Series 5600 Inside Glazed Installation Instructions

Section IX: Glazing Preparation

Step #1 Install Joint Plugs

A.)

Seal the vertical gasket raceway and slip in the joint plugs at the horizontal to vertical
intersections as indicated.

SECTION "A-A"

SHALLOW POCKET

JOINT PLUG

SECTION "A-A"

DEEP POCKET

JOINT PLUG

SECTION "B-B

PAGE 12



Prior to installing the mullion

plugs, fill the gasket raceway and

tongue raceway with sealant to

close off the void at the joint plug

locations. The sealant height

should be a minimum of 1” long

Seal the horizontal pressure

plate to the vertical pressure

plate so they are water tight

Seal all connecting surfaces of

horizontal and vertical mullions with

sealant for attachment of mull plugs.

Tool sealant into the corners of

the glazing pockets. Smooth

the sealant over the joint plugs

avoiding excess build-up

Seal around joint plug

before installation