beautypg.com

Dynojet 198: Kart and ATV Dynamometers User Manual

Page 31

background image

Document #98234100 3 - 7

Step 7

Bolt the two “U” supports to the lower Front

Deck Supports. (Front Deck Hardware Pack A)

Step 8

There is a right and a left Front Deck. The Deck

that has a bolt and bracket welded to the

underside is the LEFT and goes on the starter side

of the dyno. (This is for the carriage and

outrigger option) Place the Front Decks up to the

dyno so that the lip of the deck plate is resting on

the dyno. Line up the two holes on the lip of the

deck with the holes in the dyno and loosely bolt

the decks to the dyno, using the Front Deck

Hardware Pack C.