Great Plains NP30A 30-foot Predelivery Manual User Manual
Page 3

Great Plains Manufacturing, Inc.
08/30/2011
407-313Q
©
Copyright 2010, 2011 All rights Reserved
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.
Registered Trademarks of Great Plains Manufacturing, Inc. include:
Air-Pro, Clear-Shot, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand, Whirlfilter, Yield-Pro.
Brand and Product Names that appear and are owned by others are trademarks of their respective owners.
Printed in the United States of America
Table of Contents
Important Safety Information ......................................1
Introduction ..................................................................3
Models Covered .............................................................3
Description of Unit ..........................................................3
Using This Manual..........................................................4
About Parts.....................................................................4
Assembly and Setup Assistance ....................................4
Pre-Delivery Planning ..................................................5
Tools Required ...............................................................5
Execute the Unload ........................................................8
Hoist Unload ...............................................................8
Hoist Unload Steps:................................................8
Two Forklift Unload.....................................................9
Forklift Unload Steps: .............................................9
Drive-Off Unload.......................................................10
Drive-Off Unload Steps:........................................10
2-Point Hydraulics ....................................................12
Charge 2P Lift / Fold System................................12
3-Point Hydraulics ....................................................13
Charge 3P Fold System .......................................13
Pull-Type Hydraulics.................................................14
Install Components ....................................................15
Install Lift-Assist Casters.............................................. 16
Install Center Gauge Wheels ....................................... 17
Install Transport Rest ................................................... 18
Unfold Over-Folded Wings....................................... 18
Dismount Transport Rest ......................................... 19
Install Transport Rest ............................................... 19
Unfold Implement ......................................................... 20
Install Wing Gauge Wheels.......................................... 21
Install 2P/3P Manual Gauge Wheels ....................... 21
2P/3P Gauge Wheel Stations .............................. 21
Install 2P/3P Gauge Wheel Mounts ..................... 21
Install 2P/3P Wheels ............................................ 22
Install Pull-Type Wing Gauge Wheels...................... 23
Install Wing Extensions ................................................ 24
Install Wing Frame ................................................... 24
Mount Outside Coulters ........................................... 24
Mount Outside Knives .............................................. 25
Mount Raven Accuflow Cooler................................. 26
Attach Accuflow Frame Mount Brackets .............. 26
Attach Cooler Assembly ....................................... 26
Install Delivery Tubing .......................................... 27
Extend Conventional Tubing ................................ 28
Install Nurse Tank Hitch ............................................... 29
Install Tongue .............................................................. 30
Route Hoses and Cables ......................................... 30
Install SMV Reflector ................................................... 31
Mount Ground Drive Wheel ......................................... 31
Final Setup.................................................................. 32
Set Rough Weight Transfer ......................................... 32
Lift-Assist Valve Setup ................................................. 34
2-Point Lift-Assist Valve ........................................... 34
Install Lift Cylinder Locks ......................................... 35
Pre-Delivery Closeout................................................ 36
Stow Spacers ............................................................... 36
Stow Documents .......................................................... 36
Remove Pre-Assembly Markings................................. 36
Final Inspection ............................................................ 36
Appendix A - Reference Information........................ 37
Specifications and Capacities ...................................... 37
Anhydrous Models ................................................... 37
Conventional Models................................................ 38