beautypg.com

Field operation – Great Plains YP825A Operator Manual User Manual

Page 51

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

47

2014-08-15

Table of Contents

Index

401-651M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 21
and “Field Set-Up Checklists” on page 45.

Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.

When reloading seed and fertilizer, check consumption
against anticipated use to that point.

First Pass Operation Checklist

Page

1.

Prime fertilizer system.

35

2.

Slide gates open. Shutters set.

42

3.

Raise planter and line up at start of first
planting row.

22

4.

Prime meters with seed.
Leave fan running.

42

5.

Unfold marker on next-row side.

43

6.

Pull forward, lower planter, and begin
planting for a short distance.

22

7.

Stop. Assess:
• planting depth
• seed spacing
• press wheel operation
• fertilizer application (if in use)

-

8.

Make necessary adjustments

49

9.

Resume planting.

-

Sharp Field Turns

a

Checklist

a. Monitor manifold pressure during end-of-pass

operations and turns. Adjust operations as needed
to maintain meter pressurization.

Page

1.

Fold marker

43

2.

Raise planter when fold is complete

22

3.

Make turn

4.

Lower planter

22

5.

Unfold marker on next-row side.

43

6.

Resume planting.

Suspending Planting Checklist

Page

1.

Stop tractor

-

2.

Fan hydraulic circuit to Float or Neutral

40

3.

Hydraulic drive circuit to Float or Neutral

-

4.

Fold Marker

43

5.

Raise planter

22

Ending Planting Checklist

Page

1.

Suspend operations as above, then

2.

Install transport locks

23

3.

Lights ON

-

4.

Transport

24

This manual is related to the following products: