Changing seed meters for 25 series openers – Great Plains 3N-4025P Operator Manual User Manual
Page 52

3N-4010P, 3N-4015P, 3N-4020P and
3N-4025P
196-286M
4/23/2010
50
Changing Seed Meters for 25
Series Openers
To change from Precision Meter to Finger
Pickup Meter
1.
Shut off seed flow to meters by moving sliding
seed tube. For more information see, “Shut-
ting Off Seed Flow,” page 69.
2.
Clean out meter. For more information see
“Cleaning Out Meters,” page 70.
Refer to Figure 67
3.
Release the upper latch and swing drive plate
away until meter drive shaft is free.
Refer to Figure 68
4.
Release the lower latch.
Refer to Figure 69
5.
Lift up and remove the precision meter along
with the lower section of the sliding seed tube.
21914
21915
21916
Figure 68
Figure 67
Figure 69
This manual is related to the following products: