First time field adjustments, Pre-leveling of machine, Front to rear leveling – Great Plains TCN5313 Operator Manual User Manual

Page 41: Pre-leveling of machine front to rear leveling

background image

Great Plains Manufacturing, Inc.

Operating Instructions

37

03/17/2014

566-170M

Perform all steps in “Pre-Start Checklist” on page 24

and “Final Field Checklists” on page 36.

Do not make short radius turns with the implement in the
ground.

Note: If you stop in the middle of a pass, raise the imple-

ment and back up 3m (10 ft) before resumption of
tilling.

First Time Field Adjustments

Pre-Leveling of Machine

Note: Pre-leveling of machine should be done on a good

level surface.

Front to Rear Leveling

Refer to Figure 29

1.

Lower the machine until the front row of shanks are 1 to
2” above the surface. At this point, remove the snap
wire pin

from the turnbuckle lock

, swing lock off

turnbuckle and adjust the hitch turnbuckle

to adjust

the fore and aft. The front corner of the main frame
should be 1/2 to 1” lower than the rear corner.

2.

Now the turnbuckle lock

may be swung back onto

hitch turnbuckle

and the snap wire pin

may be re-

installed.

3.

If machine needs leveled from front to rear when run-
ning in field, remove the snap wire pin

from the turn-

buckle lock

, swing lock off turnbuckle and adjust the

hitch turnbuckle

. When done adjusting, be sure and

swing turnbuckle lock back down and secure with snap
wire pin.

First Pass Operation Checklist

Page

1. Implement unfolded and aligned for first

pass, with coulter disks about 3m before
field edge.

25

2. Pull forward, lower Turbo-Chisel, and

begin tilling for a short distance.

3. Stop. Assess:

• coulter depth

• shank depth

• finishing attachment operation

4. Make necessary adjustments

37

Sharp Field Turns Checklist

Page

1. Raise Turbo-Chisel

30

2. Make turn

3. Lower Turbo-Chisel 3m before field edge

29

4. Resume tilling.

Ending Tilling Checklist

Page

1. Suspend operations as above, then

2. Lift implement

3. Set tractor for fold

26

4. Fold wings

26

5. Place locking valves in transport position

29

6. Place transport locks in transport position

7. Lower implement on to transport locks

8. Lights ON for transport

Figure 29

Hitch Turnbuckle Adjustment

41805

3

1

2

1

2

3

2

3

1

1

2

3